Hardiepanel vertical siding is one of their key product lines and like other hardie materials it is constructed of cement and fiber for durability.
Hardie panel siding installation.
9 5mm from panel edges and no closer than 2 in.
Combine hardiepanel vertical siding with hardietrim boards for a rustic board and batten look.
From panel edges water resistive barrier stud hardiepanel siding.
Instantly access installation info technical bulletins sds sheets more.
Installation manual for reveal panel system page 3 section 1 introduction the material contained herein provides installation guidelines for the reveal panel system by james hardie.
Manufactures and sells a range of exterior shingle siding board panel and trim products.
And canada who are available to work with any contractor or builder.
As a homeowner you will work with a contractor who will facilitate the installation of your james hardie siding trim soffit wrap and flashing products including products with colorplus technology.
Because we get so much snow and ice in edmonton these requirements are very important.
We have dozens of installation specialists throughout the u s.
Most of the james hardie installation requirements in canada are designed to deal with excess moisture.
50mm away from corners plate keep nails 3 8 in.
50mm away from corners.
Hardiepanel vertical siding must be joined on stud.
Position fasteners 3 8 in.
The james hardie co.
Hardie siding requires a minimum 2 gap from all hard surfaces like decks or rooflines and at least 8 from any soft surfaces like grass dirt or.
This document is intended for use by builders cladding installers and other contractors who may be involved with the installation of the reveal panel system.